Revised Recommendations
Committee of the Whole recommends Council approve the following:
Ridgeview Park Community Centre and Field House
- Administration undertake a Cottam facility needs analysis with public input, including discussions with Essex County Library, Cottam Baseball, Cottam Soccer, and Cottam Rotary
- Design new building (Picnic Pavilion, Community Space, Storage, Library etc.) as determined by needs analysis
- Demolition of Cottam Community Centre, and Ridgeview Park Field House, and build new Building
Kingsville South Fire Station
- Obtain an Engineering Report for a structural analysis regarding the lifecycle of the facility
- Prepare a needs assessment and proposal for renovations when EMS relocation occurs
Kingsville Town Hall
- Prepare recommendations to relocate Town Hall offices and Council Chambers to a new location within the next 3 to 5 years
- Prepare recommendations for use of the current building
Public Works and Environmental Services
- Prepare recommendations to expand and renovate, or relocate, the Public Works and Environmental Services Yard within the next 3 to 5 years
Lions Community Hall
- Develop an Agreement with Lions Club for use of alternative facility, as possible
- Demolition of Lions Hall after all tenants have been given reasonable time to relocate
- Construct accessible washroom for Lions Park subject to capital budget
Carnegie Arts And Visitors Centre
The following recommendations be brought back for discussion at strategic planning:
- Provide the BIA with location for their storage unit, secure the BIA’s downtown speaker system, and assume costs of internet and phone
- Make space in the lower level available for community use, including the BIA Board Meetings
Kingsville Recreation Complex and Arena
- Obtain an Engineering Report for a structural analysis regarding the lifecycle of the facility
Grovedale Arts and Culture Centre
- Develop an Operations and Business Plan with an emphasis on community use, arts, music and culture with a reduced emphasis on weddings and private functions.
Lakeside Park Pavilion
- Obtain an Engineering Report for replacement of lake-facing outdoor patio
- Upgrade washroom and kitchen facilities subject to budget approvals
- Complete an electrical servicing needs study for Pavilion and park to address needs of outdoor events and festivals and indoor electrical and servicing needs
Kingsville OPP Station
- Prepare a report on potential options for the use of the site, including market appraisal
- Prepare a report, in consultation with OPP, on potential options for relocation of the OPP into a new or renovated facility
Ezra Fox Municipal Building / Kingsville Highline Library / Unico Community Centre
No motion was made on the recommended actions. However, more discussion on these facilities may take place at a later date.
Share Revised Recommendations on Facebook
Share Revised Recommendations on Twitter
Share Revised Recommendations on Linkedin
Email Revised Recommendations link
5 comments
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends