New Cottam Community Centre

Share New Cottam Community Centre on Facebook Share New Cottam Community Centre on Twitter Share New Cottam Community Centre on Linkedin Email New Cottam Community Centre link

The Town of Kingsville is constructing a new Community Centre in Cottam, replacing the Ridgeview Field House and Cottam Library. This decision was made after a facilities building review in 2023. Budget was approved in 2024.

After a needs assessment with Cottam user groups and consideration of public feedback, the town received two design options for public review and feedback.

Each facility design incorporates:

  • An outdoor pavilion
  • Community Hall
  • Library space
  • Storage for user groups (i.e Cottam Soccer and Cottam Baseball)

You can review the proposed layouts/locations.

Survey Results

The Town of Kingsville is constructing a new Community Centre in Cottam, replacing the Ridgeview Field House and Cottam Library. This decision was made after a facilities building review in 2023. Budget was approved in 2024.

After a needs assessment with Cottam user groups and consideration of public feedback, the town received two design options for public review and feedback.

Each facility design incorporates:

  • An outdoor pavilion
  • Community Hall
  • Library space
  • Storage for user groups (i.e Cottam Soccer and Cottam Baseball)

You can review the proposed layouts/locations.

Survey Results

  • Option A

    Share Option A on Facebook Share Option A on Twitter Share Option A on Linkedin Email Option A link
    CLOSED: This discussion has concluded.

    Option A includes an outdoor pavilion, community hall, library space and a separate storage area for user groups (i.e Cottam Soccer and Cottam Baseball). The design shows the building placed where the existing Cottam Library is located (on Fox Street), but the design can also be constructed where the existing Ridgeview Fieldhouse is located (inside the park).


    Option A - Ridgeview Park Community Centre Rendering 1


    Option A - Ridgeview Park Community Centre Rendering 2


    Option A - Ridgeview Park Community Centre Site Plan


    Option A - Ridgeview Park Community Centre Floor Plan


    Option A - Ridgeview Park Community Centre Front View


    Option A - Ridgeview Park Community Centre Side View (Pavilion Side)


    Option A - Ridgeview Park Community Centre Side View (Building Side)


    Option A - Ridgeview Park Community Centre Back View


    Option A - Ridgeview Park Community Centre Storage Unit


  • Option B

    Share Option B on Facebook Share Option B on Twitter Share Option B on Linkedin Email Option B link
    CLOSED: This discussion has concluded.

    Option B includes an outdoor pavilion, community hall, library space and storage area for user groups (i.e Cottam Soccer and Cottam Baseball) located within the building. The design shows the building placed where the existing Ridgeview Fieldhouse is located (inside the park), but the design can also be constructed where the existing Cottam Library is located (on Fox Street).Option B - Ridgeview Park Community Centre - Rendering 1


    Option B - Ridgeview Park Community Centre - Rendering 2

    Option B - Ridgeview Park Community Centre -Site Plan
    Option B - Ridgeview Park Community Centre - Floor Plan
    Option B - Ridgeview Park Community Centre - Front View
    Option B - Ridgeview Park Community Centre - Side View (Pavilion Side)


    Option B - Ridgeview Park Community Centre - Side View (Building Side)



    Option B - Ridgeview Park Community Centre - Back View



Page last updated: 28 Nov 2024, 08:29 AM